Material Resources Planning
From Opentaps Wiki
Revision as of 22:56, 27 September 2007 by Sichen (talk | contribs) (Protected "Material Resources Planning": Sysop page [edit=sysop:move=sysop])
To determine whether a product will be manufactured or purchased, the system will consider whether it has a Bill of Material of its own and whether it has any supplier products defined for purchasing. By default, a part is considered manufactured if it has child nodes AND if it also has no unexpired SupplierProducts defined