Material Issuance Tests

These tests require that the QOH of MAT_A_COST is 0 and the QOH of MAT_B_COST is greater than 100.


Action 1

Create and [Confirm] a production run for 2 of PROD_COST. [Start] the task.


Results 1

The list of Materials has a new button [Issue Additional Materials]. Each product for the task is listed:

  • MAT_A_COST with Qty Issued 0 and an input box in the Needed column containing the default qty to issue of 4.
  • MAT_B_COST with Qty Issued 0 and an input box with default qty to issue of 6

Action 2

Press the [Issue] button to submit the default quantities for MAT_A_COST (4) and MAT_B_COST (6).

Results 2

The page reloads with a warning in red at the top of the page: Warning: This will cause QOH of product MAT_A_COST to become negative No warning about MAT_B_COST. [Issue] button has changed to [Force Issue]. The qty needed is still the same as before (4 and 6).

Action 3'

Pres [Force Issue]. A popup confirm dialog comes up. Confirm the action.

Results 3

Page reloads with the following differences:

  • Task now has a [Complete] button next to it.
  • Qty Issued for MAT_A_COST is 4
  • Qty Issued for MAT_B_COST is 6
  • No [Issue] button and no input boxes for Needed qty. This column should be gone.

Action 4

Create and [Confirm] another production run for 2 of PROD_COST. [Start] the task. Enter 0 for quantity needed for MAT_A_COST. Enter 1 for MAT_B_COST. Press [Issue].

Results 4

The issuance should be successful and there should be no warnings and no [Force Complete]. Qty Issued for MAT_A_COST is still 0. The qty needed for MAT_A_COST is still 4. Qty issued for MAT_B_COST has increased to 1. Qty needed for MAT_B_COST is down to 5.

Action 5

Issue 1 of MAT_A_COST and 1 of MAT_B_COST.

Results 5

The page reloads with a warning that MAT_A_COST will have negative QOH. The [Force Complete] button comes up. The quantities in the input boxes for Needed are: 1 for MAT_A_COST and 1 for MAT_B_COST.

Action 6

[Force Issue] the issuance and confirm.

Results 6

Page reloads with successful action message. Quantity issued for MAT_A_COST is now 1, while quantity Needed in input box is 3. Quantity issued for MAT_B_COST is now 2 and the needed quantity is now 4.

Action 7

Issue the remaining 3 MAT_A_COST. Enter 6 for MAT_B_COST needed (to simulate spending 2 extra material due to losses). Force the issuance through.

Results 7

Issuance is successful and the Needed column with the [Issue] button is no longer there. Qty issued for MAT_A_COST is 4. Qty issued for MAT_B_COST is 8.


Issuing more Materials to a Task

Ensure that the QOH for GZ-1000 is 0 and GZ-1001 is greater than 100.


Action 8

Press [Issue Additional Materials]. A form to issue extra products to the task comes up. Issue 2 of GZ-1000 (should be QOH 0).

Results 8

The input form reloads with warning that GZ-1000 QOH would become negative. [Force Issue Additional Materials] button comes up.

Action 9

Force the issuance through.

Results 9

Production run screen should reload showing that 2 GZ-1000 was issued in the list of Materials.

Action 10

[Issue Additional Materials] for 5 GZ-1001 (which should have QOH > 100).

Results 10

No Force issuance required. Production run screen loads immediately showing 5 GZ-1001 issued.

Action 11

[Issue Additional Materials] for 2 MAT_B_COST.

Results 11

No force issuance required. Production run screen loads immediately showing 10 total MAT_B_COST issued.