Create Production Run

From Opentaps Wiki
Revision as of 23:07, 30 August 2007 by Sichen (talk | contribs) (Protected "Create Production Run": Sysop page [edit=sysop:move=sysop])
Jump to navigationJump to search

This screen allows you to create a production run to manufacture a product. Enter the following fields

  • Product ID - for the product you are manufacturing
  • Quantity - number of units of the product to be manufactured
  • Start Date - date and time when the production run will begin
  • Routing Id - identifies the routing, which is a list of tasks, required to manufacture the product. The routing must already be associated with the product using the Manufacturing > Routing >> Routing Product Link screen. If you do not enter one, the system will use the first routing associated with the product, or DEFAULT_ROUTING if none are found.